Trenchless Technology

Trenchless Technology such as HDD would be used to install the 20.1 kilometre transmission cable under roads. HDD would be used to transition the submarine cables to the onshore cables at the landfall site in Yarmouth.

Upon completion, the proposed project would have an electrical energy capacity of 468 MW, with 130 turbines each capable of producing cable duct up to 3.6 MW. The project would be the first ever wind farm in the US, but is yet to receive federal  authorisation.